How Long Does a Bathroom Remodel Take from Start to Finish?

how long does a bathroom remodel take Home Remodels in Yukon Home Remodels in Mustang Home Remodels in Bethany Home Remodels in Warr Acres Home Remodels in Piedmont Home Remodels in El Reno Home Remodels in The Village Home Remodels in Union City Home Remodels in Concho Home Remodels in Tuttle Home Remodels in Britton Home Remodels in Nichols Hills Home Remodels in Banner Home Remodels in Richland Home Remodels in Woodlawn Park

A bathroom remodel is one of the most rewarding home improvement projects you can undertake. Whether you’re transforming a dated space into a modern retreat or updating fixtures for better functionality, a remodel can dramatically improve comfort, resale value, and daily life. But one of the first questions homeowners in Mustang and Yukon, OK ask us at Run Enterprises is: “How long will it take?”

The answer depends on the scope of the remodel, the size of the space, the materials chosen, and how prepared you are before construction starts. In general, a full bathroom remodel typically takes 3 to 6 weeks of active construction, but the entire process—from planning to final inspection—can span 6 to 12 weeks or longer.

Let’s break it down step-by-step so you know exactly what to expect.

1. The Planning & Design Phase (1–3 Weeks)

Every successful remodel starts with solid planning. Before a single tile is laid or a pipe is moved, you’ll need to:

  • Define your goals (e.g., new layout, better storage, updated finishes)
  • Establish a budget
  • Choose materials, finishes, and fixtures
  • Finalize the design and layout

At Run Enterprises, we work closely with homeowners across Mustang and Yukon to create customized plans based on their lifestyle, aesthetic preferences, and budget. We help you select everything from vanities and tile to lighting and faucets—and we make sure everything fits your space and timeline.

This phase can take 1 to 3 weeks, depending on how quickly decisions are made and product availability. The more prepared and decisive you are, the faster we can move into the construction phase.

2. Permitting and Ordering Materials (1–3 Weeks)

Before demo begins, we ensure all necessary permits are pulled and materials are on order. In Oklahoma, permits may be required for electrical, plumbing, or structural changes—even for smaller remodels.

Permits and inspections can take a few days to a couple of weeks, depending on local building departments in Mustang or Yukon.

Meanwhile, we’re ordering:

  • Tile and flooring
  • Vanity and cabinets
  • Plumbing fixtures (toilets, sinks, shower heads)
  • Lighting and electrical items
  • Custom or semi-custom items (e.g., shower glass or cabinetry)

Some materials are in stock and arrive quickly. Others—like custom vanities or imported tile—can take 3–6 weeks. We recommend finalizing selections early to avoid timeline delays.

3. Demolition and Prep (2–5 Days)

Now the fun part begins: demolition. Our crew carefully removes old fixtures, tile, flooring, drywall, and cabinetry while taking steps to protect other areas of your home.

If mold, rot, or hidden water damage is discovered (common in older homes in neighborhoods like Canyon Ridge or Surrey Hills), repairs may be needed before continuing. We always keep homeowners informed if this happens.

Once demo is complete, we inspect the framing, plumbing, and electrical to ensure everything is ready for the new installation.

Typical timeline: 2–5 days

4. Rough-In Work (3–5 Days)

With the space cleared and prepped, we begin the rough-in phase. This includes:

  • Updating plumbing lines for new layouts or fixtures
  • Running new electrical wiring for lighting or outlets
  • Installing exhaust fans or ventilation if needed

This stage is especially important if you’re switching from a tub to a walk-in shower, adding a double vanity, or relocating any major components.

After rough-ins are complete, an inspection may be required depending on local codes in Mustang or Yukon.

Typical timeline: 3–5 days

5. Installation of Walls, Flooring, and Tile (5–10 Days)

Once inspections are passed, we close up the walls and begin installing the finishes that bring your bathroom to life.

This includes:

  • Drywall and painting
  • Flooring installation
  • Tiling shower walls, floors, or backsplashes
  • Installing waterproofing membranes and backer boards

Tile work takes time to get right. Grout needs to dry properly, and certain layouts or intricate patterns may extend the timeline.

Typical timeline: 5–10 days, depending on size and complexity

6. Fixture & Finish Installation (4–7 Days)

This is when your bathroom really comes together. Our team installs:

  • Vanities and countertops
  • Toilets and faucets
  • Lighting and mirrors
  • Shower doors or enclosures
  • Hardware like towel bars, hooks, and shelves

If you’ve chosen custom cabinetry, we ensure everything is aligned and finished to perfection. In neighborhoods like Brookstone Lakes or Frisco Ridge, where homeowners often choose higher-end finishes, this stage may involve more detailed work.

Typical timeline: 4–7 days

7. Final Touches & Cleanup (1–2 Days)

Before we hand the space back over to you, we walk through every detail:

  • Conduct a thorough cleaning of the job site
  • Test plumbing and electrical systems
  • Make minor touch-ups if needed
  • Review punch list items with you

At Run Enterprises, we never leave a job unfinished. We make sure your new bathroom is spotless, functional, and ready for daily use.

8. Total Timeline Recap

Here’s a general timeline summary for a full bathroom remodel:

PhaseTimeframe
Planning & Design1–3 weeks
Permits & Material Orders1–3 weeks
Demolition2–5 days
Rough-Ins3–5 days
Walls, Flooring, Tile5–10 days
Fixtures & Finishes4–7 days
Final Touches & Cleanup1–2 days
Estimated Total6–8 weeks average

Note: Larger or more custom projects, or those requiring structural changes, may take 8–10+ weeks.

Factors That Can Extend a Bathroom Remodel Timeline

While we aim to stay on schedule, a few factors can impact timing:

  • Permit delays or inspection hold-ups
  • Custom orders with long lead times
  • Scope changes after construction begins
  • Surprise issues like plumbing leaks or mold
  • Homeowner decisions made mid-project

At Run Enterprises, we proactively communicate to keep you informed and help avoid surprises. We build in contingencies and keep projects moving without sacrificing quality.

Trust Run Enterprises for Bathroom Remodeling in Mustang & Yukon, OK

Whether you’re remodeling a small guest bath or creating a spa-like master suite, the team at Run Enterprises is here to guide you through every step—on time and on budget. We bring years of experience, high-quality workmanship, and a local reputation for reliability.

If you’re ready to update your bathroom with a trusted local team, contact us today to schedule your free consultation. Let’s bring your vision to life—one step at a time.